I would totally say “I saw insert thing on the way to work today,” and would have assumed that would be the natural way to say it, but now I’m questioning that
I would totally say “I saw insert thing on the way to work today,” and would have assumed that would be the natural way to say it, but now I’m questioning that
As mentioned with the other guy, 0 inches is the requirement to the top of the cable or raceway used. So at minimum, you’re allowed to be perfectly flush with the ground. Obviously you can and likely would go a little lower, although I don’t have any experience with trenching myself.
The 0 inches is to the top of the cable or raceway used, so it would be have to be at least perfectly flush with the ground. Obviously you can go lower.
I looked up on google at one point what the minimum required depth for a cable running under a building is by NEC code. It told me it was 0 inches. I laughed and called it stupid, wtf do you mean 0 inches?? Upon further research, 0 inches is the correct answer, I felt real stupid after that -_-
Ohmy god, watt are you even talking about. It’s just being amped up by the media.
I’m 18 and I’ve seen both a check and a fax machine! My father has check books lying around, and I’m an electrician so I saw the owners bring a fax machine into a rehab center we were working at.
According to the image on Wikipedia depicting the plates, there would then be 17 continents, although some of those 17 would be entirely ocean, or only small islands
Well, whats the official term? If its just tail spikes I will be very disappointed
It can be both. A bomb that was a dud can still eventually explode. Just not when you wanted it to.