• 0 Posts
  • 1 Comment
Joined 2 years ago
cake
Cake day: June 23rd, 2023

help-circle
  • Removed gross drop ceiling installed in master bedroom at first of the year. Rerouted wiring for ceiling light/fan properly thru the attic. Installed 2x4 strapping, fresh 1/2" drywall, and scabbed in 12" of drywall to complete the wall to the ceiling that the original remodellers covered up with drop ceiling (previous owner)

    I’m so sick of mudding, and it still looks a bit bumpy / wavy but we love the added ceiling height. Just put the first coat of paint on the ceiling earlier this week. The black ceiling is moody/cozy and covers a multitude of mud sins. Heavily considering refinishing the hardwood floor with the room still mostly empty.

    Old houses are never square. Drywall tests the utter limits of my perfectionism. (Learned that hot mud isn’t so hot for finish work)

    Ditto on being tired… But things are starting to shape up. Good luck to everyone else with their projects. Not much else to do around here with single/negative temperature. Slow and steady wins the race!